Borehole equipping and installation

Borehole Equipping is the most important stage in the borehole drilling process.At Shoeman Kenya Ltd  we have a team of professionals who have equipped hundreds of boreholes across Kenya. This is final phase of a borehole project where a pump is installed with all its accessories such as control panel, submersible and underground cables, galvanized pipes and main to the tank. A power source with mains or generator is required. The borehole equipping consists of (but not limited to) the following; pump installation with its accessories like control panel, submersible and underground cables, galvanized pipes and main to the tank. We also do elevated water tanks.

Once the borehole has been drilled, a Borehole Completion Record (BCR) from WRA that contains important information concerning that borehole will be issued. This information can then be shared with us so that we can do a proposal for the most suitable equipment.

During installation, the Borehole Installation Team is mobilized and material transported to the site for installation. Once the pump is installed and connected to the power source, testing is done for an appropriate period and key operation parameters recorded, after which a detailed operation and maintenance manual is issued.